IMAGE PROJECT NAME Description Benefits Project Cost Status
WATER WELL #5 REHABILITATION The Project included the removal and reinstallation of the well house, pump assembly and electrical motor; videotaping of well casing; wire brushing of the casing; removal of debris after wire brushing; well development; rehabilitation of pump bowl assembly and electrical motor service; and disinfection of the well. Improve water system reliability and water quality.

$210,582

Completed
CATCH BASIN CLEANING AND STENCILING (City wide) Citywide cleaning of 600+ catch basins in Lynwood and stenciling of “No Dumping, This Drains to Ocean” logo at catch basin locations. To avoid flooding and reduce the amount of trash and other contaminants from entering the public waters.  This project helps the City comply with its MS4 permit.

$144,000

Completed
PROP 84 INSTALLATION OF TREE BOX FILTERS AND BIORETENTION TREE WELLS Installation of 3 tree box filters and 10 bioretention tree wells for Low Impact Development (LID) Best Management Practices (BMP's). This type of structural Low Impact Development Best Management Practices aims to prevent stormwater contamination of surface waters in the Los Angeles River by treating stormwater runoff and its associated pollutants.  There is also an added benefit of recharging the groundwater. Under Design
SCADA Installation of a Supervisory Control and Data Acquisition (SCADA) system to manage and remotely control all of the water system facilities. The system will allow staff to monitor and control the operation of the City’s water system 24/7 on-site or remotely.  This improved ability to monitor the system will increase the operational efficiency by maximizing the use of ground water and minimizing the need for imported MWD water, which is more costly, and reducing overtime. Under Construction
GENERATORS AND WELL HOUSE IMPROVEMENTS Site new emergency generators for Water Wells No. 8,9,11 and 19, and the Public Works Yard. This project also includes site improvements to Water Well No. 5. Operation of this new well will allow the City to improve supply reliability in the case of SCE power outages, reducing the City's reliance on imported water, thereby saving money. Under Construction
WELL HEAD TREATMENT FOR WATER WELL NO. 11 The installation of a granulated activated-carbon (GAC) well-head treatment system for Well No. 11. This project will improve water quality to better provide safe drinking water to the City’s customers. Under Design
GATEWAY CITIES REGIONAL RECYCLED WATER SYSTEM EXPANSION The cities of Lynwood, Bell Gardens, and South Gate are partnering with the Central Basin Municipal Water District to develop plans and specifications for the construction of recycled water pipelines. Phase I includes the design of the extension of a recycled water line from Ham Park to Linear Park, and to Lynwood Park. Helps the City conserve water by decreasing the use of potable water and rely instead on reclaim water for lanscape irrigation. Under Design
UNDERGROUND STORAGE TANK MONITORING Conduct sampling and testing for ground water monitoring wells located at the City Hall complex. Survey the 3 monitoring wells and report test results to the State Water Resources Control Board. Comply with the State requirements regarding monitoring. Under Design
TRAFFIC SIGN IMPROVEMENT(PHASE I) (City Wide) Upgrading cabinets, installing conduits and new wires Improved traffic flow and decreased traffic collisions.

$247,000

Completed & Accepted
WATER WELL #22 Construction of new water well to be located at 3611 Spruce Street.  Operation of this new well will allow the City to improve supply reliability and deliver portable groundwater more economically to its customers. Under Design
WATER WELL #19 REHABILITATION Rehabilitation of pump to fix shaft vibration. This water well was taken out of service due to excessive vibration. This project will improve the well's reliability.

$54,620

Completed & Accepted
LOS FLORES BLVD STREET IMPROVEMENT Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Enhancement of median island. Improve Median island lanscape, sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$247,000

Completed & Accepted
LOUISE STREET (From Monrovia Ave. to Long Beach Blvd.) Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, pavement, and installation of new water line. Improve ride quality,sidewalk safety, traffic flow and enhance the streetscape aesthetic. Under Design
LONG BEACH BLVD (PHASE II) Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve Median island lanscape, sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$3,128,879

Under Construction
SEQUOIA DRIVE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality, sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$363,511

Completed
MICHIGAN AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality, sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$363,511

Completed
CITY WIDE TREE TRIMMING Citywide trimming of trees to place trimming on a 2 year cycle.  FY14, FY15, and FY16 completed. A Five-Year Contract with TLC was approved To properly maintain our urban forest and improve our neighborhood aesthetic.

$320,000 / year

Under Contract
MTA SHELTER SIDEWALK IMPROVEMENT (City wide) Project consists of removal of pavers and installation of concrete sidewalk on existing Metro bus stop locations. To improve pedestrian safety for Metro bus boarding.

$30,000

Completed
WISCOSIN AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality, sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$363,511

Completed
WALNUT AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$410,500

Completed & Accepted
VIRGINIA AVENUE (From Martin Luther King Jr. Blvd. to Sanborn Ave.) Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$469,469

Completed
VIRGINIA AVENUE (From Bullis Road to Thorson Avenue) Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality,sidewalk safety, traffic flow and enhance the streetscape aesthetic. Under Design
STATE STREET AND CEDAR AVENUE INTERSECTION IMPROVEMENT Removal and replacement of collapsed Storm drain pipes. Performed Chemical grouting to sustain the weight above the storm drain pipes and avoid future failures. Improve the life of the storm drain pipes by performing chemical grouting. Improve the overall storm drain system and reliability.

$200,000

Completed
CITY WIDE SIDEWALK IMPROVEMENT Remove and replace damaged and uplifted sidewalk. Improve sidewalk safety.

$193,000

Completed
REDWOOD AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$410,500

Completed & Accepted
PLATT AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality,sidewalk safety, traffic flow and enhance the streetscape aesthetic. Under Design
CITY WIDE PEDESTRIAN SAFETY Installed sidewalks for pedestrian safety and new ADA compliant curb ramps at various school intersections. Improve Pedestrian safety at various school intersections by exending the curbs (bulbouts). Reduce traffic congestion and provide traffic calming measures.

$478,000

Completed
LYNWOOD CITY PARK-OUTDOOR FITNESS ZONE Installation of 22 pieces of outdoor fitness exercise equipment; project involved removal of existing sand and replacement with compacted soil and concrete slab, and installation of posts for shades sails. This project provide recreational exercise equipment to encourage healthy and active lifestyles.

$160,000

Completed & Accepted
OLANDA AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality,sidewalk safety, traffic flow and enhance the streetscape aesthetic. Under Design
NEVADA AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality, sidewalk safety, traffic flow and enhance the streetscape aesthetic. Under Design
LUGO AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality,sidewalk safety, traffic flow and enhance the streetscape aesthetic. Under Design
LOUISE AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality,sidewalk safety, traffic flow and enhance the streetscape aesthetic. Under Design
LOS FLORES BLVD WATER MAIN REPLACEMENT Installation of new water main. Improve water system reliability and water quality.

$210,900

Completed
LONG BEACH BLVD (PHASE I) Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement and new median islands. Improve ride quality, median island lanscape, sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$3,589,848.67

Under Construction
LONG BEACH BLVD CRACK SEAL Crack sealing of concrete pavement. To eliminate cracks on concrete pavement. Prepared street for street rehabilitation.

$175,000

Completed
LINDEN STREET Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$469,469

Completed
JOSEPHINE STREET Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$745,000

Completed & Accepted
LUCY AVALOS COMMUNITY CENTER Construction of a sustainably designed 8,600 square foot community center building.  The building will include a reception area, public restrooms, storage area, equipment room, central game room, small and large multi-purpose rooms, stage and a patio areas. Provide a community facility for year-around youth recreational programming and community rentals.

$5,691,144

Completed
FIR STREET Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality,sidewalk safety, traffic flow and enhance the streetscape aesthetic. Under Design
FERNWOOD AVENUE AND BULLIS ROAD INTERSECTION TRAFFIC IMPROVEMENT Upgraded signal poles and cabinets to improve traffic flow. Marked a new crosswalk for the Linear Park at Bullis Rd. and Fernwood Ave. Intersection, to direct Pedestrians to a safe crossing location. Improve traffic flow at intersection.Traffic signal timing was optimized to maximize efficiency through the intersection which makes a safer crosswalk for the residents near the intersection.

$247,000

Completed & Accepted
ELMWOOD AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$469,469

Completed
BULLIS ROAD Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality,sidewalk safety, traffic flow and enhance the streetscape aesthetic. Under Design
CORNISH AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality, sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$363,511

Completed
CHARGE READY PROGRAM Charge stations for City fleet and consumers. To help improve air quality by promoting and supporting the use of Electric vehicles.

$360,000

Completed
BEECHWOOD AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality,sidewalk safety, traffic flow and enhance the streetscape aesthetic. Under Design
BUS SHELTER INSTALLATION Installation of new bus shelters at 66 Metro bus stop locations. The scope of work includes installation of bus shelters, lighting, trash receptacles, Metro Rapid poles and signs. New bus shelter amenities for transit riders.

$1,600,000

Completed
BRADFIELD AVENUE Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve sidewalk safety, traffic flow and enhance the streetscape aesthetic.

$321,321

Completed
CITY HALL ANNEX Construction of a 10,430 square foot building to house a new Council Chambers, offices for City Council and Administration, IT offices, and lobby area. Provide an ADA compliant facility, a comfortable community assembly space for council meetings, and an energy and space efficient facility.

$7,672,845

Under Construction
BIRCH STREET Project consists of removal and replacement of sidewalk, curb and gutters, driveway approaches, trees, and pavement. Improve ride quality,sidewalk safety, traffic flow and enhance the streetscape aesthetic. Under Design