One lane in both directions for Long Beach Phase 2 Area (south of Imperial Highway) will be closed all next week (May 21 through May 26) from 7am to 5pm. The closure will be in place due to the ongoing median island work as the irrigation and landscaping is set to be installed. Paving is also set to begin May 30th and street closures are anticipated overnight.